Neilsoft supported a Leading Engineering Firm based out of US and specializing in Civil/Site, Transportation, Hydraulic, Structural, MEP, Construction Engineering, Professional Land Surveying, and Landscape Architecture related Services, for a Brownfield Community High School Project. The project involved demolition of building tunnels and installation of all the required new services. Neilsoft provided the following services during various stages of the project: BIM Architectural Modeling in Revit (LOD 200) | HVAC Design including Allied Hydronic Piping and Electrical Power Supply | BIM MEP Modeling in Revit (LOD 300) | Final BID Set & Construction Document Set Extraction from the Revit Model - For the Demolition and Installation Phases | Boiler Room Design and HVAC Services in the Tunnels
Please fill the form to download
the Detailed Case Study